Job Synopsis
New Roof Vent for Bathroom Exhaust needed installation.
Job Outcome
New Vent installed, (New Hole Cut into Roof with New Vent Cap).
Extras at no additional cost
Replacement of Original Vent (Exhaust was poorly attached to a plastic attic vent. D4L Disconnected old Rigid Duct from plastic vent cap and replaced vent with metal vent).
A Few cracked Shingles were noticed and repaired.
Expanded
Rigid Duct used and poorly installed to plastic roof vent for exhaust. It was pretty much venting directly into my attic space. Condo corp gave authorization for work to be done, once I fully explained what the issue was. Roof shingles and sheeting are condo common elements and need Condo approval for any alterations.
Katie from D4L was super patient with all of my questions. The roofers that did the work were very friendly and seemed knowledgeable. The work was done in about 20-30 minutes. They did not have to come into my unit to do any of the work.
Katie was also patient waiting for me to go back and forth with my Condo Corp to get the approvals for work. All questions I had on the contract were answer promptly.
I would definitely use D4L again in the future.
Attached picture show the new Bathroom Exhaust vent and replaced attic Vent (Post Install).