Tiler Tech

Bathroom Renovation
Edmonton AB T5V
Write a Review
Write a Review

Kat from Edmonton
Kat from Edmonton
1 review Edmonton, AB

First Review

0/10

Bathroom Reno

ALL pictures were updated and were taken after their last visit.

We are still unhappy with the “finished’ product. The floor is the only repair that was completed successfully, and it was just laid over top of the original ripped one. At this time we have 3 different colours of grout in our shower, sloppy caulking, none mitered baseboard join and so much more. The owner of the company is aware and had asked us to say that he was trying to accommodate us but the co-owner would not.
The first day of the again spread out 2 month (with 5 days access while we were away) repair work the co-owner installed our sink in backwards. The plumber (not a licensed plumber) came the next day to re hook up the plumbing and had to change it all. It was not until the next day when we went to use the sink that we realized that it was in backwards. The co-owner was upset that we wanted it installed properly and asked us why we could not leave it backwards!!!
It does look a bit better than it did and the floor is fixed. But needless to say we have decided to cut our losses. Also we were told that the bathroom is completed to a professional level and they would not return. That is fine as we do not want them to return.
We were also told before they returned to do repair work that they had their Provincial Licensing to operate legally. As of Nov 10th 2015 they still do not according to Service Alberta. Case closed but not resolved to our satisfaction.

Approximate cost of services:
$8,600.00
2 of 3 people found this review helpful.
Was this review helpful?

Previous versions of this review:

Kat from Edmonton
Kat from Edmonton
1 review Edmonton, AB

First Review

1/10

Bathroom Reno

UPDATE in progress:
We are currently working with TilerTECH to fix any remaining issues. A new review will be submitted after they complete the rest of the work. Thank you.

Approximate cost of services:
$8,600.00
Kat from Edmonton
Kat from Edmonton
1 review Edmonton, AB

First Review

0/10

Bathroom Reno

A 3 day $8600 bathroom reno started July 2nd 2014 to date still not completed properly. Countless issues, but here is what remains as of November 28, 2014. I have decided NOT to have them return and filed a complaint with the BBB and Service Alberta.
Most important! TIlerTech does NOT as of December 2014 have a Prepaid Contractors License. It is required by law if a down payment is taken and many other specifications are required on the contract as well. Please contact Service Alberta for all information needed. If you are a current TilerTECH customer PLEASE call Service Alberta for information.
Major issues still existing:
1. Cracked grout in tub surround and no baseboard in place where the trim was removed due to a sticker being caulked in place.
2. Trim is not one solid piece on both sides of surround. Even after having it taken off both sides once already.
3. All caulking needs to be redone. Was applied with fingers and has a wide spread. There is dirt and paint under it, has holes and is sloppy.
4. 3/4" drywall as put up over the existing walls. Only the middle seem was mudded and taped for the new drywall. The corners and ceiling was dapped. Tyler admitted that they did not tape the one wall the first time. Unfortunately after many attempts you can still see the We gave up and tried to fix it ourselves.
5. A second coat of paint is still needed on the walls, trim and ceiling.
6. The RIPPED floor is our biggest complaint. A smaller tub was installed then the original tub. Therefore the sub floor was 2 inches short to reach the tub. So they simply TUCKED the lino floor under the edge of the tub. We did notice and had them come back. On this first visit they only leveled half of the floor that was visible. They had to return the next day as the cement wasn't dry. Then we called and had them back to level the other side of the floor that's between the toilet and tub. However upon leveling the other side they didn't pull up the lino all the way and ripped the floor.
We called again and they came again weeks later. It was simply caulked over. It looked horrible. We called again and they sent another guy around October 15th 2014. He used white caulking over it the area and got dirt everywhere. So the rip was now a grey dirty color. He also tried to fix the drywall tape and bubbles that day. He was supposed to return the next day to paint. I called to complain again and they wanted to cover the rip with corner round. I refused as this is supposed to be a new bathroom, not a fixed bathroom.
Marco came back out AGAIN to try to patch the floor. It looked horrible. I called Tyler to say I wanted the floor replaced. Weeks later on a Monday a "professional" was to come to replace the floor. On that Monday they again where a no show. That Friday Tyler and his crew showed up late, dropped off a piece of baseboard they had to replace and left and the flooring professional showed up at 3pm. Upon talking to the flooring man he said he has meet Tyler at Homedepot around noon that day and he was asked to patch the floor. He also showed me that Marco's patch was held down by 2 way tape!! Unfortunately this guys job is bad. We now have gaps around the patch.
Customer service /Professionalism:
1. Tyler told me they had ordered the wrong vanity by mistake. It was the one I had asked for but less than 24hrs later and 2 weeks before the start date I had asked for a different one. He explained that I can take the one that was in and it would be installed tghe next day or I could wait a week for the proper one. I decided to wait. Later that day he called to say they have one in Calgary and if I PAY for his gas he will go get it. I refused. Amazingly it was there the next day anyhow.
2. They were a no show 3 times. No explanation given. Late every time scheduled as much a 9am turned into 2pm. Weeks to a month between service calls.
3. I was text from Marco "We will do all we can to try and and achieve your standards of excellence" when all I asked for is a level floor!!!
4. I received a asking if I would take a different tub as they had an extra one. I did say yes but looking back It was a mistake.
5. Texts from Tyler saying how is workers are ignoring him.
6. Conversation at home with Tyler cursing his crew for costing his thousands in repair work.
Site cleanup:
Tools left out, drywall dust & paint splatter. Used our magazines to cut objects on. Left he toilet box in our back yard. Painters tape in the toilet (that has clogged and been snaked) Poor quality workmanship
1. Non bathroom paint used on walls and trim. (Once we realized we purchased the proper paint ourselves)
2. Drywall is not mildew resistant
3. We were told twice that clear caulking had been used but it "turned" white.
4. When painting they did not take down the fixtures or outlet covers.
5. Back of vanity and trim "hacked" with hand saw. We had a niche cut in that was redone many times as it was cut wrong (too high and long wide) and then framed with 1 by 2 white boards. This was corrected after many attempts of patch work.
Thankfully Tyler showed up and told Marco to redo it not patch it. The sticker in the picture was removed on the final visit even though it was mentioned in the beginning. But by removing it they damaged the baseboard (the one they dropped off an left) and also had to replace both tub surround metal trim as mentioned above the one side is pieced together.
Supplies we provided I supplied all bathroom fixtures. Shower curtain rod (but they threw it out during demo and gave us a cheap one that is rusting now.), towel rack, toilet paper holder, toilet, baseboards, trim, paint, mirror and sink faucet. Only the toilet was taken off our bill.
We did upgrade our vanity light and were not charged the extra $12. Many other issues have been fixed but I believe should not have ever been an issue.
I understand that renovations have hiccups and can be delayed but almost 6 months for a 3 day job. Every time they came out to fix something they broke something else. If they had only leveled the floor day 1 instead of doing a trying to cover it up most of our issues never would have happened. We would never recommend this company.

Read more at https://trustedpros.ca/company/tilertech#ClMsOCjufwjl4UZy.99

Approximate cost of services:
$8,600.00