replaced all windows, perimeter trim, installed new kitchen, new washrooms, built new washroom in basement including the necessary plumbing, tile work in both washrooms and kitchen, tiles backsplash, all new LeD pot lights, updates electrical switches and receptacles. Installed new front and back doors. Completely new basement (framed entire basement as per drawing, insulation, vapor barrier and drywall including taping and mud). Painted entire basement and prepped floors for carpet installation.
These guys has a tight deadline and did whatever it took working most days until after 7 pm!